This is a list showing the Approved Survey Forms – available to the public.
Detail Page for U1262
Miltown
Length: 0.36 miles (0.580 km)

No signs
Has steep bank on North river bank, gentle one on South bank
Please Note – Conditions vary & observations were accurate at time of survey
April 11, 2016
Surface:
40% Tarmac | 20% Grass | 25% Mud | 15% River (5%) Unrecorded (10%) |
Condition:
Northern end overgrown and washed out, rutted entry to river
Sensitivity: Weather
River crossing has fallen trees and steep 8ft climb out to North
Sensitivity: Local Environment
South entry leads to Milltown, a renovated mill with lawned section over route.
Possible building over correct route
Owners likely to be very surprised if anyone drives on “their” lawn!
Observations:
Easy Access | Through Route | Not Signed | Generally Flat | Ford/Water Crossing
Normally passable by: 4 Wheel Drive, Quad, Trail Bike
Minimum width: 8.0 ft (2.44 m)
