This is a list showing the Approved Survey Forms – available to the public.
Detail Page for U1203
Hayton
Length: 0.23 miles (0.370 km)

Description:
High speed traffic on A69 at north end of UCR
Section of UCR 1203 on north side of A69 is a tarmac layby
Please Note – Conditions vary & observations were accurate at time of survey
July 21, 2016
Surface:
50% Tarmac | 50% Crushed Stone |
Condition:
tractor rutted farmland access lane
Sensitivity: Weather
N/A
Sensitivity: Local Environment
None
Observations:
Awkward Access | Through Route | Not Signed | Generally Flat
Normally passable by: 4 Wheel Drive, Carriage, Quad, Trail Bike
Minimum width: 15.0 ft (4.57 m)
ENTRY ID 601 | Date of Posting: September 23, 2024 at 3:00 pm
